irajya

Successful construction and maintenance of 1 MLD deflouridation ETP for NALCO

Challenge

The effluents at the NALCO smelter plant in Angul had a fluoride level of 35 PPM, which had to be reduced to 1 PPM

Solution

Outcome

The plant has been 100% operational since February 2017 and successfully addressed the issue of fluoride contamination endemic to the Angul sector. The plant has been providing chemical free drinking water.